Skip to main content

Posts

Showing posts with the label Intake

Mazagon Dock Ltd Results 2013 – Group A, B, C, Intake 2013 Final Results

Mazagon Dock Ltd Results 2013 – Group A, B, C, Intake 2013 Final Results : Mazagon Dock Limited has announced first wait list of final results for the posts in Group C, Intake 2013. Group A, Intake 2013 and Group B- Electronic Mechanic, Carpenter, Intake 2013. Attended candidates can check their results at below link…. Click here for Group A, B, C, Intake 2013 Final Results Mazagon Dock Ltd Results 2013 – Skilled Gr-I, Semiskilled Gr-I, III Interview List : Mazagon Dock Limited has declared interview list for the posts of Junior Draughtsman, Pharmacist, Jr. Q.C.Inspector (Mechanical, Electrical), Jr.Planner Estimator (Mechanical,Electrical), Engine Driver, Pipe Fitter, Trainee Pipe Fitter, Electrician, Electric Crane Operator, Painter, Carpenter, Composite Welder, Rigger, Machinist, Utility Hand, Chipper Grinder and Trainee Chipper Grinder of Advt No.67/2013. Interview will be held from 22-11-2013 to 27-11-2013. Aspirants can check their status at below link…. Click here for Skilled Gr...